Objectives
- Stabilize eroded stream banks
- Restore the floodplain to its natural state and function
- Change the stream path to a more natural design
- Improve habitat for aquatic life
- Enhance water quality
- Improve stormwater control measures (SCMs) to reduce pollution
Estimated Cost: $3 million**
*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.
The project team will manage the project through several phases. Specific work is conducted during each phase and public involvement is emphasized throughout the process.